HURRICANE AIR & SWABBING SERVICES LLC
5949 US HIGHWAY 64
PO BOX 389
FARMINGTON, NM 87401
United States
ph: 505-632-6885
Hurrican
RIG 1 FREIGHTLINER SWAB RIG
Wilson draw works with 12,500’ 9/16” sand line, four leveling jacks and winch. Equipped with blocks and rod tools to pull rods. 3 man crew.

RIG 2 COOPER LTO 300 WORKOVER RIG
Powered by 3406 CAT and 5860 ALLISON transmission, 4- axle carrier with PEMCO 96 FT 180000# derrick. Tubing Board Capacity: 2-3/8”= 16,000’, 2-7/8”= 12,000’, 3-1/2”= 9,500’, 4-1/2”=6,000’. 7/8 drill line, 4 hydraulic leveling jacks, winch, 7-1/16 3000# BOP and tubing tongs. 12,500’ 9/16” sand line. Equipped with 2-7/8 and 2-3/8 tubing tools, 5/8,7/8,3/4 and 1’ rod tools. 4 man crew.

AIR 3 1500 CFM/2000 PSI MOBILE AIR PACKAGE
Primary: 20/12 STR Series SULLAIR DRILL COMPRESSOR driven by a Series 60 14L Detroit. Booster: ARIEL JCQ-2 driven by a Series 40 Detroit with a 3-stage custom-built heat exchanger. Pump: F3L 1011 DEUTZ driving a KM3250 triplex with all necessary piping, tanks and chemical pumps. The above components are mounted on a custom-built Aztec drop deck with extended neck and inverted fifth wheel for hauling via standard oilfield trucks. Computerized Murphy control panel with solid-state fault annunciator and shutdown control system, with hour-meter designed to protect engines and compressors.

AIR 4 1500 CFM/2000 PSI MOBILE AIR PACKAGE
Primary: 20/12 STR Series SULLAIR DRILL COMPRESSOR driven by a Series 60 14L Detroit. Booster: CIP PHT2 driven by a Series 40 Detroit with a 3-stage custom-built heat exchanger. Pump: F3L 1011 DEUTZ driving a KM3250 triplex with all necessary piping, tanks and chemical pumps. The above components are mounted on a custom-built Aztec drop deck with extended neck and inverted fifth wheel for hauling via standard oilfield trucks. Computerized Murphy control panel with solid-state fault annunciator and shutdown control system, with hour-meter designed to protect engines and compressors.
(photo to be posted shortly)
RIG 5 INTERNATIONAL SWAB RIG
Hopper drawworks with 12,500’ 9/16” sand line. Four leveling jacks and winch. Equipped with blocks and rod tools to pull rods. 3 man crew.

RIG 6 COOPER LTO 350 WORKOVER RIG
Powered by C-15 CAT and 8 speed CAT transmission, 4 axle carrier with PEMCO 96 FT 180000# derrick. Tubing Board Capacity: 2-3/8”= 16,000’, 2-7/8”= 12,000’, 3-1/2”= 9,500’, 4-1/2”=6,000’ 1” drill line. 4 hydraulic jacks, winch, 7-1/16 5000# BOP and tubing tongs, 12,500 9/16” sand line. Equipped with 2-7/8 and 2-3/8 tubing tools. 5/8, 3/4, 7/8 and 1” rod tools. 4 man crew.

RIG 7 HOPPER WORKOVER RIG
Powered by 3406 CAT and 5860 ALLISON transmission. 4 axle carrier with PEMCO 96FT 180000# derrick. Tubing Board Capacity: 2-3/8”= 16,000’, 2-7/8”= 12,000’, 3-1/2”= 9,500’, 4-1/2”=6,000’, 1” drill line, 4 hydraulic leveling jacks, winch, 7-1/16 3000# BOP and tubing tongs. 12,500’ 9/16” sand line. Equipped with 2-7/8 and 2-3/8 tubing tools, 5/8, 3/4, 7/8 and 1” rod tools. 4 man crew.
(photo to be posted shortly)
RIG 8 FRANKS SWABBING RIG
Franks drawworks with 12500 FT of 9/16 sand line, 4 leveling jacks and winch. Equipped with blocks and rod tools to pull rods. 2 man crew.

RIG 9 2008 COOPER WORKOVER RIG Powered by C-15 CAT and 5860 ALLISON transmission, 5 axle carrier with 96’ 260,000# Harold Lee derrick. Tubing Board Capacity: 2-3/8”= 16,000’, 2-7/8”= 12,000’, 3-1/2”= 9,500’, 4-1/2”=6,000’, 1” drill line, 4 hydraulic jacks, winch, 7-1/16 3,000# BOP and tubing tongs. 12500FT of 9/16 sand line. Equipped with 2-7/8 and 2-3/8 tubing tools. 5/8, 3/4, 7/8 and 1” rod tools. 4 man crew.

RIG 10 CARDWELL WORKOVER RIG
Powered by 3406 CAT and 5860 ALLISON transmission, 5 axle carrier with Cardwell 96’ 180,000# derrick. Derrick is rigged up with breakdown jacks. Tubing Board Capacity: 2-3/8”= 16,000’, 2-7/8”= 12,000’, 3-1/2”= 9,500’, 4-1/2”=6,000’, 1” drill line, 4 hydraulic leveling jacks, winch, 7-1/16 3,000# BOP and tubing tongs. 12,500’ of 9/16” sand line. Equipped with 2-7/8 and 2-3/8 tubing tools.5/8, 3/4, 7/8 and 1” rod tools. 4 man crew.

AIR 11 1600 CFM/2000 PSI MOBILE AIR PACKAGE
Primary: 20/12 STR Series SULLAIR DRILL COMPRESSOR driven by a C-15, 15.2L Caterpillar. Booster: CIP PHT2 3-stage driven by a Cummins QSM11, 10.8L with a 4-stage custom-built heat exchanger. Pump: Cummins A-1700 37hp driving a model 253THP triplex with all necessary piping, tanks, chemical pumps, and flow-meter in barrels per hour. Computerized Murphy control panel with solid-state fault annunciator and shutdown control system, with hour-meter designed to protect engines and compressors.

RIG 12 2006 TAYLOR WORKOVER RIG
Powered by 3406 CAT and 5860 ALLISON transmission. 5 axle carrier with PEMCO 96FT 180,000# derrick. Derrick is rigged up with breakdown jacks. Tubing Board Capacity: 2-3/8”= 16,000’, 2-7/8”= 12,000’, 3-1/2”= 9,500’, 4-1/2”=6,000’, 1” drill line, 4 hydraulic leveling jacks, 2 winches, 7-1/16 3,000# BOP and tubing tongs. 12500FT of 9/16 sand line. Equipped with 2-7/8 and 2-3/8 tubing tools, 5/8,3/4,7/8 and 1” rod tools. 4 man crew.

AIR 13 1600 CFM/2000 PSI SELF-PROPELLED AIR PACKAGE
Primary: ATLAS COPCO XASE 745 SERIES DRILL COMPRESSOR driven by a C-15, 15.2L Caterpillar. Booster: CIP PHT2 driven by a C-15, 15.2L Caterpillar with an ALLISON 5860 6-speed transmission with a custom-built heat exchanger. Pump: Cummins A-1700 37hp driving a model 253THP triplex with all necessary piping, tanks, chemical pumps, and flow-meter in barrels per hour. Computerized Murphy control panel with solid-state fault annunciator and shutdown control system, with hour-meter designed to protect engines and compressors.

RIG 14 WILSON WORKOVER RIG
Powered by 3406 CAT and 4460 ALLISON transmission. 3 axle carrier with Wilson 72’ 120,000# derrick, Tubing Board Capacity: 2-3/8” = 6,000’ 2-7/8” = 5,000’, 7/8” drill line, 4 hydraulic leveling jacks, winch, 7-1/16 3,000# BOP and tubing tongs. 12,500’ of 9/16” sand line. Equipped with 2-7/8 and 2-3/8 tubing tools, 5/8, 3/4, 7/8 and 1” rod tools. 4 man crew. SINGLE/DOUBLE

RIG 15 IDECO WORKOVER RIG
Powered by 3406 CAT and 4460 ALLISON transmission, 3 axle carrier with Ideco 72’ 120,000# derrick, Tubing Board Capacity: 2-3/8” = 6,000’ 2-7/8” = 5,000’ 7/8 drill line, 4 hydraulic leveling jacks, winch, 7-1/16 3,000#BOP and tubing tongs. 12,500’ of 9/16” sand line. Equipped with 2-7/8 and 2-3/8 tubing tools. 5/8, 3/4, 7/8 and 1” rod tools. 4 man crew. SINGLE/DOUBLE

RIG 17 2007 TAYLOR WORKOVER RIG
Powered by 3406 CAT and 5860 ALLISON transmission. 5 axle carrier with PEMCO 96’ 180,000# derrick. Tubing Board Capacity: 2-3/8”= 16,000’, 2-7/8”= 12,000’, 3-1/2”= 9,500’, 4-1/2”=6,000’, 1” drill line, 4 hydraulic leveling jacks, winch, 7-1/16 3,000# BOP and tubing tongs. 12,500’ of 9/16” sand line. Equipped with 2-7/8 and 2-3/8 tubing tools. 5/8, 3/4, 7/8 and 1” rod tools.4 man crew.

Copyright this business. All rights reserved.
HURRICANE AIR & SWABBING SERVICES LLC
5949 US HIGHWAY 64
PO BOX 389
FARMINGTON, NM 87401
United States
ph: 505-632-6885
Hurrican






